Managed recovery process (MRP) The managed recovery process (MRP) applies information from the archived redo logs to the standby database. When performing managed recovery operations, log apply services automatically apply archived redo logs to maintain transactional synchronization with the primary database.

Full Answer

How does Oracle MRP plan engineering items?

Oracle MRP plans engineering items exactly as it does manufacturing items. All engineering components are planned for accordingly and are visible on inquiries and reports. Note: You must set up all appropriate planning attributes when you define an item.

What is the purpose of MRP process?

The Managed Recovery Process (MRP) actually does the work of maintaining and applying the archived redo logs. Role Management Services - Control the changing of database roles from primary to standby. Click to see full answer. Considering this, what is Oracle MRP process?

When does Oracle MRP generate a reschedule in message?

Oracle MRP always generates a reschedule in message if an order is scheduled to arrive later than it is required. Although the planning process may suggest rescheduling some scheduled receipts and may not suggest rescheduling others because of the acceptable early days limit, it does not violate the order of the current scheduled receipts.

What is by-product recovery in Oracle MRP?

See: By-Product Recovery, Oracle Work in Process User's Guide. Oracle MRP includes negative requirements on standard and non-standard discrete jobs and components with a negative usage on a bill of material when netting supply and demand. This type of component requirement is considered as supply available on the job completion date.

How do I stop MRP process?

To stop the MRP, issue the following sql statement. ALTER DATABASE RECOVER MANAGED STANDBY DATABASE CANCEL; Earlier on RAC environments, MRP process can be run only from one instance on standby site.Mar 3, 2021

How do I check my MRP process in standby database?

Make sure that Redo Apply is running (so that the change is applied to the standby database). If the following query returns the MRP or MRP0 process, Redo Apply is running. SQL> SELECT PROCESS, STATUS FROM V$MANAGED_STANDBY; To verify that deleted datafiles are no longer part of the database, query the V$DATAFILE view.

How do I increase MRP process?

How to Speed up and Troubleshooting MRP (Log Apply Rate of a Standby Database) Stuck Issues. 3) Consider increasing sga_target parameter, if it's set to low. 4) Check for Disk I/O. Move you I/O intensive files to faster disks including Online Redo log and Standby redo log files.Aug 29, 2014

How do I know if MRP is running or not?

Best Answer1.To Start media recovery on standby database : SQL> alter database recover managed standby database disconnect from session;Perform few log switch on Primary database. SQL> Alter system switch logfile; SQL> / SQL> /Monitor Various process on standby database by :Jun 8, 2011

What is RFS process Oracle?

The Remote File Server (RFS) process writes the redo data to standby redo log files on the standby database.Jan 30, 2022

What is LSP in Oracle Data Guard?

- Logical Standby Process (LSP) ? The LSP applies the redo records from archived redo logs to the logical standby database. The Oracle database log miner engine is used by the logical standby process for the SQL apply operations.Jan 12, 2015

What is MRP in Oracle Data Guard?

Managed recovery process (MRP) The managed recovery process (MRP) applies information from the archived redo logs to the standby database. When performing managed recovery operations, log apply services automatically apply archived redo logs to maintain transactional synchronization with the primary database.

How do I start MRP in parallel?

A complete statement to start recovery in background is: ALTER DATABASE RECOVER MANAGED Oracle instance DISCONNECT FROM SESSION; If the database is DML intensive, a multiple parallel recovery process can be started on the standby site to spread the load during the log apply operation.

How can I start Data Guard?

Restart the Oracle Data Guard broker DMON process, as follows: SQL> ALTER SYSTEM SET DG_BROKER_START=TRUE; Enable the broker configuration using the DGMGRL ENABLE command or the Enable operation in the Oracle Data Guard management pages of Cloud Control.

How do I know if real time apply is enabled on standby database?

For logical standby databases, issue the statement, ALTER DATABASE START LOGICAL STANDBY APPLY IMMEDIATE; To determine if real time apply is enabled, you can query the recovery_mode column in the v$archive_dest_status view. It will display MANAGED REAL TIME APPLY when real time apply is enabled.

Overview of Parallel Processing

Oracle MRP distributes processing across multiple concurrent processes to maximize performance and make optimal use of machine resources. The architecture of Oracle MRP that enables distributed concurrent processing allows you to:

Process Control

Oracle MRP breaks tasks into smaller tasks that can be executed concurrently by independent processes. Oracle MRP controls the execution of these processes, independent of the hardware platform.

Inter-process Communication

Oracle MRP breaks tasks into smaller tasks that are executed concurrently by independent processes (workers). The programs that execute these tasks concurrently need to communicate to coordinate their actions.

Single Processor Machine

Distributing the workload across multiple independent processes should give performance benefits, even when running on a single processor machine. Many Oracle MRP processes make frequent accesses to the database. Therefore, the processes tend to be I/O bound.

Snapshot

The Snapshot takes a copy, or ”snapshot,” of all the information used by the planning processes so that the planning processes can operate on a picture of the data frozen at a point in time, and report against that snapshot at any future time.

Snapshot Parallel Processing

The Memory-based Snapshot takes a copy, or ”snapshot,” of all information used by the planning processes so that the planning process can operate on a picture of data frozen at a point in time and report against that snapshot at any future time.

Planner Parallel Processing

The Memory-based Planner is the process within the planning engine that performs a gross-to-net explosion. That is, for each level in the bill of material, it nets available inventory and scheduled receipts against gross requirements, and recommends a set of planned orders and order reschedules to meet gross requirements.

When can you define an MRP planning method?

You can define an MRP planning method for an item when you define an item in Oracle Inventory. Items that are considered by the planning process must have one of the following MRP planning methods:

What is a DRP in planning?

You can use these distribution requirements plans (DRPs) as input for your material plans. You can combine centralized distribution and material planning, for items with significant interorganization supply or demand, with decentralized planning, where you prefer autonomous, local planning.

What is Oracle Supply Chain Planning?

Oracle Supply Chain Planning applies the basic planning process (described in Overview of Planning Logic) across multiple organizations. Planned order supply and sourcing information are loaded according to the list of organizations and supply schedules defined for the multiple organization plan.

What is alternate supplier in Oracle?

If the primary supplier does not have the capacity to meet demand, alternate suppliers can be specified according to your priority. The supplier capacity defined in Oracle Purchasing is used to determine if the primary source can fulfill the order. The ranking order specified in in the rules and bills determines which sources can be used as alternates.

Can you retrieve a sourcing rule?

You can quickly and easily retrieve sourcing rules for reference. After retrieving a sourcing rule, you can display it in a convenient, hierarchical representation, or you can locate the assignment sets in which it is assigned.

Can you derive a master schedule from DRP?

In addition to standard sources, Supply Chain Planning users can derive the master schedule from DRP Planned orders. You can manually define your supply chain master schedule or modify entries loaded from other sources.

Can you generate a DRP from a master demand schedule?

If you do not need to smooth production or otherwise manually manipulate a master production schedule, you can generate an MRP or DRP plan directly from a master demand schedule.

image
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z 1 2 3 4 5 6 7 8 9