How long is a perc test good for?
How Long is a Perc Test Good For? Each health department has its own rules about how long perc tests are valid. Results are generally valid from two to five years before renewal is needed. At that time, the health department reviews previous perc test results and decides if additional testing is needed.
How much does a perc test cost in Pennsylvania?
Everything you need to know about perc test costs and prices in Pennsylvania. What is the cost of percolation test in Pennsylvania? The cost of percolation test in Pennsylvania is $329.09 fixed fee. * Was this information helpful? Price considers the cost of perc test.
What are the rules for Percolation tests in Pennsylvania?
This section cited in 25 Pa. Code § 71.63 (relating to retaining tanks); 25 Pa. Code § 73.12 (relating to site location); and 25 Pa. Code § 73.161 (relating to general). § 73.15. Percolation tests. Percolation tests shall be conducted in accordance with the following procedure: (1) Number and location.
How long are test test results good for?
Test results are usually good for two to five years, and in some cases can be renewed. However, with all things perc, rules vary greatly from town to town so don’t make any assumptions. Always check with the town health department before proceeding.
Do I have to replace my septic tank by 2020?
Under the new rules, if you have a specific septic tank that discharges to surface water (river, stream, ditch, etc.) you are required to upgrade or replace your septic tank treatment system to a full sewage treatment plant by 2020, or when you sell a property, if it's prior to this date.
How long should a septic system last?
15 to 40 yearsA septic system's lifespan should be anywhere from 15 to 40 years. How long the system lasts depends on a number of factors, including construction material, soil acidity, water table, maintenance practices, and several others.
What is a perc test in Pennsylvania?
Percolation Test (Perc Test) Briefly, the Perc Test consists of measuring the rate of water drop (or infiltration) in at least six vertical holes dug in the intended absorption area, see Figure 2. The Perc Test must be conducted by the SEO.
What time of year is best to do perc test?
The time of year can definitely affect perc test results as well as the level of the water table, which is also a concern. In general, the driest season will yield the best results since dry soil readily absorbs water and the water table is lowest. Soil saturated with water from rain or melted snow will not perc well.
What is the most common cause of septic system failure?
The most common cause of septic system failures is inadequate maintenance and/or improper care. Specifically, not pumping out the solids in a septic tank regularly is the most common failure mode. Septic tanks should be pumped every 3-5 years depending on occupancy and use.
How often should you pump your septic tank?
every 2-5 yearsHow often should you have your septic tank pumped? You should clean your septic tank every 2-5 years depending on how many bedrooms you have in your house as well as the local regulations.
How deep is a perk test?
two feet deepA typical perc test consists of three or more holes dug about 30 to 40 feet apart in the proposed drain field area (see illustration). The holes are typically 6 to 12 inches in diameter and two feet deep, the typical depth of the trenches in a leach field.
Can I install my own septic system in PA?
Installing a New Septic System All homeowners must obtain a permit from the PDEP before installing an aboveground or underground septic system. The PDEP offers two specific types of operating permits: a Permit-By-Rule (PBR) or a General Operating Permit (GOP).
Do you need a license to install a septic system in PA?
Repairing or replacing a septic system requires a permit from the local SEO. Routine maintenance such as tank pumping and distribution pipe flushing can be done without a permit.
Does rain affect a perc test?
Ideally, a percolation test will be performed when the ground is saturated, or just following a significant rain storm. If it has not recently rained, you may want to repeat step 3 before conducting the experiment.
What would cause a perc test to fail?
If this “limiting zone” of unsuitable soil is too close to the surface, then the site will fail. In jurisdictions that do not require perc testing, the inspectors are also evaluating the soil for drainage characteristics, either visually or with the help of a lab tests.
What does it mean if land doesn't perk?
NO PERC, NO HOUSE On rural sites without municipal sewage systems, a failed perc test means that no house can be built – which is why you should make any offer to purchase land contingent on the site passing the soil and perc tests.
What is a perc test?
While most soil experts believe that soil observation can provide enough information to design an effective septic system, most states today also require perc testing to directly measure the rate at which water percolates through the soil. The test measures how fast water drains into a standard-sized hole in the ground. The results determine whether the town will allow a septic system to be installed, and system designers use the results to size the leach field.
What does it mean if a house is not built on a perc test?
On rural sites without municipal sewage systems, a failed perc test means that no house can be built – which is why you should make any offer to purchase land contingent on the site passing the soil and perc tests. As prime building sites become increasingly scarce (or prohibitively expensive) in many parts of the country, rural sites that will not pass a percolation or perc test are increasingly common.
How long does it take for a septic system to percolate?
The percolation rate is usually expressed in minutes per inch of drop. A rate of 60 minutes per inch (MPI), meaning the water dropped one inch in 60 minutes, is often the cutoff point for a standard gravity-flow septic system, although the maximum number varies from 30 to 120 MPI depending on local regulations. Some towns require additional “hydraulic” soil tests for sites that test above 30 minutes per inch.
How to test for clay content?
To get a rough idea before investing time and money in testing, dig below the top few inches of topsoil (loam) to the lighter soil beneath and grab a handful. If the soil has a sticky, damp texture, and you can form a small lump of damp subsoil into a long, thin ribbon or worm shape that holds together, then the soil has significant clay content .
Percolation Test - 19104, Pennsylvania
Estimate takes into account the cost of perc test. Price does include testing soil to determine if site is suitable for septic leach field construction. Excludes backhoe loader rental fees, soil remediation, deep probe, or septic permit.
Percolation Test - 15290, Pennsylvania
Labor is included in this perc test estimate. Price accounts for testing soil to determine if site is suitable for septic leach field construction. Additional charge for backhoe loader rental fees, soil remediation, deep probe, or septic permit.
Percolation Test - 15901, Pennsylvania
This price includes perc test. No additional charge for site evaluation to verify if soil can support an on-site sewage disposal system. Cost does not account for backhoe loader rental fees, soil remediation, deep probe, or septic permit.
Percolation Test - 16515, Pennsylvania
Price considers the cost of perc test. Estimate includes testing soil to determine if site is suitable for septic leach field construction. Does not include backhoe loader rental fees, soil remediation, deep probe, or septic permit.
Percolation Test - 17401, Pennsylvania
Includes labor cost for soil percolation test. Accounts for the price of soil testing to establish if land can support a septic field and watewater treatment system. Excludes deep hole test, backhoe or excavator rental, septic field construction, and septic permit inspection fees.
Percolation Test - 17701, Pennsylvania
Manhours for soil percolation test are included. Estimate includes soil testing to establish if land can support a septic field and watewater treatment system. However, it does not include deep hole test, backhoe or excavator rental, septic field construction, and septic permit inspection fees.
Percolation Test - 18101, Pennsylvania
The soil percolation test cost presumes typical conditions. Also includes soil testing to establish if land can support a septic field and watewater treatment system. Price does not account for deep hole test, backhoe or excavator rental, septic field construction, and septic permit inspection fees.
What does a Perc test measure?
Steve Bliss, of BuildingAdvisor.com, responds: A perc test measures the rate at which water is absorbed (percolates though) the soil. The time of year can definitely affect perc test results as well as the level of the water table, which is also a concern. In general, the driest season will yield the best results since dry soil readily absorbs water and the water table is lowest.
Does a dry soil perc well?
In general, the driest season will yield the best results since dry soil readily absorbs water and the water table is lowest. Soil saturated with water from rain or melted snow will not perc well. A site will also fail if the water table is too high, although most towns require that the tester identify the seasonal high water table be observing ...
What is a perc test?
The Perc Test is a relatively complex procedure designed to determine how rapidly effluent will enter the soil on your property during the wettest, worst-case conditions. Briefly, the Perc Test consists of measuring the rate of water drop (or infiltration) in at least six vertical holes dug in the intended absorption area, see Figure 2. The Perc Test must be conducted by the SEO.
What happens to the limiting zone in Pennsylvania?
In Pennsylvania, as the distance between the soil surface and the limiting zone decreases, the number of on-lot sewage disposal options available to the homeowner decreases and the systems become more costly. The minimum depth-to-limiting-zone requirements for various types of soil absorption areas are shown in Table 1.
How far does a treatment tank have to be from the soil?
Research and experience have shown that effluent from a treatment tank needs to percolate through at least four feet of an aerobic soil profile for the soil to properly treat the effluent. In most systems, the 4-foot minimum distance is measured vertically upward from the limiting zone to the bottom of the absorption area. In some alternate systems, the 4-foot separation requirement has been relaxed, but these special cases require an additional pre-treatment unit, such as a sand or peat filter, or an aerated geotextile unit between the treatment tank and where the effluent enters the soil. In a few alternate systems, disinfection may also be required. The 4 feet of suitable soil is where the treatment tank effluent undergoes the necessary physical, chemical and biological transformations needed to convert the complex organic waste compounds to relatively harmless simple organics, carbon dioxide and water. These treatment processes are enhanced by contact with the soil particles, especially when there is sufficient oxygen present in the soil to support the growth of aerobic microorganisms.
How long does it take to do a perc test?
Perc tests take one to three hours for undeveloped sites and one to two hours for a site that needs a septic system replacement. For complicated, larger sites, it may take up to six hours.
Why is a perc test necessary?
A perc test is necessary as it helps determine the soil’s absorption rate. The percolation test factors into the design of a septic system for land or homes that are not connected to their local sewer system.
What happens if your soil fails a perc test?
If your soil fails a perc test, this doesn’t necessarily mean your soil is unusable or unhealthy. You can explore a few options further regarding the quality of your soil and how much it absorbs water. A second opinion can make a big difference to the eventual installation of a septic drain field on your property.
How much perc per inch for a septic system?
A good perc rate for a septic system is between 1 and 30 minutes per inch. Between 30 and 60 minutes per inch might require hydraulic analysis for installing a septic system. Anything under 1 minute per inch or over 60 minutes per inch is not an ideal perc rate.
What is a Perc test report?
In most locations, a perc test report is required to plan a new or renovated septic system, which is included in the price of the perc test. Once finalized, the report is provided to the local health department and becomes a public record. A perc test report provides standard data such as testing date, location of the test, technician name, and under what conditions the perc test was performed.
What is a percolation test?
A percolation test is a special soil test 1 that evaluates the soil’s ability to accommodate a septic system to dispose of sewage under the ground. A perc test evaluates both the soil and the site to determine whether a septic system can be installed on the property. The percolation rate refers to the soil absorption rate, or how quickly soil absorbs water. This is important because a septic system installed in a location with poor percolation could lead to significant sewer backup, soil degradation, and structural issues for homes and buildings, in addition to health and safety concerns.
How much does it cost to dig a perc hole?
Costs can be as low as $150 for a perc test with one or two shallow holes dug by hand or shovel. On the more expensive end, prices can be as high as $1,500 for digging more than two 6-foot deep holes with a backhoe operator, engineer, and septic designer on site.
What is a perk test?
A perk test is data used towards applying for a permit. There is no time limit on the validity of the data provided that testing procedures remain constant, the site conditions remain the same, and the test location may be verified. It may be possible to use a test that is 10 years old --- or (in rare cases) it may not be possible to use results for perk tests performed the same year.
Why do sellers have a perk test?
Sellers often have a perk test performed in an attempt to show that the property is “buildable”. BEWARE ! A perk test alone is not sufficient to determine that a sewage system may be constructed on the site. It is recommended that a property buyer secure a sewage permit prior to purchasing a property. Back to Top.
How long does a sewer permit last in Pennsylvania?
Three years unless sooner revoked or suspended. Note: While the Pennsylvania Sewage Facilities Act (Act 537 of 1966) provides for a 3 year life for sewage permits, Act 46 of 2010 has provided a temporary extension for many permits. If you believe that your permit has expired or is about to expire, call the SEO to find out if the extension applies to your permit.
When does a sewer permit expire?
A sewage permit will expire unless construction has started on both the system and the structure in which it is to serve prior to the expiration date. Township Ordinance further defines the start of construction for the structure to require that the foundation be completed and approved by the Township Building Inspector.
Do you need a permit to repair a sewer line in Pennsylvania?
Yes, Yes, and Yes. The Pennsylvania Sewage Facilities Act Regulations require that a permit be issued prior to any repair activity.
What is the PA code for seepage beds?
This section cited in 25 Pa. Code § 73.53 (relating to seepage beds); and 25 Pa. Code § 73.161 (relating to general).
What is PA code 71.63?
This section cited in 25 Pa. Code § 71.63 (rela ting to retaining tanks).
What is 73.11 amended under?
The provisions of this § 73.11 amended under section 9 of the Pennsylvania Sewage Facilities Act (35 P. S. § 750.9); The Clean Streams Law (35 P. S. § § 691.1—691.1001); and section 1920-A of The Administrative Code of 1929 (71 P. S. § 510-20).