Where can I get installation instructions for my James Hardie products?
Mar 19, 2020 · How do you install James Hardie soffit panels? It is best to install a self-adhering membrane on the wall before the subfascia and trim boards are nailed in place, and then come back to install the kickout. Maintain a minimum 25mm …
Who will I work with to install my Hardie® siding?
James Hardie will assume no responsibility for moisture infiltration. • Ensure gutters have end caps. Maintain a minimum 1 in gap between end caps and siding & trim (fig.5). • Install kickout flashing at roof-wall junctions. (fig 6.) • James Hardie Building Products provides installation /wind load information for buildings with a
How do you use Hardie plank lap siding?
Sep 10, 2013 · Learn how to install HardiePanel Vertical Siding products. This video will outline the basics of installing James Hardie's fiber cement products. For more in...
What color flashings should I use with hardieplank lap siding?
Mar 19, 2021 · Trust the siding experts at Northville Lumber to help you sort through all of the options to find the perfect balance of beauty and durability to give your h...
Can I use Hardie panel for soffit?
How do you connect soffit panels?
Do you nail in soffit?
How far apart do you nail soffit?
How do you attach fascia boards?
What should be installed first siding or soffit?
What type of nails do you use for a soffit and fascia?
What screws to use for soffit?
What nails do you use for soffit?
How much do you overlap fascia?
Soffit and Fascia Installation | Trim Bender
How do you install soffit corners?
- Insert the soffit panel into the channel.
- Make sure the panel forms a 90-degree angle with the wall.
- Nail up the panel.
- Repeat these steps for each panel.
- Be sure the tongues and grooves of each panel line up with the panels alongside them.
How to Install Soffit - The Balance Small Business
How thick is a soffit board?
How to Choose the Right Soffit Size for a House | Allura USA
How wide should flashing be?
James Hardie recommends 6-inch-wide flashing that overlaps the course below by 1-inch. However, some local building codes may require different size flashing. Joint flashing must be durable, waterproof material that does not react with cement products.
How many planks can be removed from a pallet?
When taking planks from the pallet for installation, avoid repeating the texture pattern by working your way across the pallet (instead of down). Two to four planks can be removed from a stack at one time. Then, you should take material from adjacent stacks, again working across the pallet.
When to use light colored joint flashing?
Use light-colored joint flashing when using light-colored siding with ColorPlus® Technology or other siding with light finishes. Dark-colored joint flashings should be used on siding with dark finishes.
Does Hardieplank have a slip sheet?
HardiePlank lap siding with ColorPlus® Technology is shipped with a protective laminate slip sheet, which should be left in place during cutting and fastening to reduce marring and scratching. The sheet should be removed immediately after each plank is installed.
Can you make your own starter strip?
HardiePlank lap siding requires a starter strip beneath the first course. You have two options here – you can make your own or you may be able to find acceptable prefabricated, third-party starter strips available for purchase. You can make your own fiber cement starter strip by ripping a piece of HardiePlank lap siding into 1-1/4-inch strips.
Can you add videos to your watch history?
Videos you watch may be added to the TV's watch history and influence TV recommendations. To avoid this, cancel and sign in to YouTube on your computer.